Design and Implementation of Fault Tolerance Network in Launch Control System
Il-Hyung Jung1, Jae-Chel Ahn2, Kyung-Rok Moon3, Jae-Yong Lee4, Byung-Chul Kim5
1Il-Hyung Jung, “Launch Complex Department, Korea Aerospace Research Institute” / “Information and Communication Engineering Department, Chungnam National University”, Daejeon, Rep. of Kore.
2Jae-Chel Ahn, Launch Complex Department, Korea Aerospace Research Institute, Daejeon, Korea.
3Kyung-Rok Moon, Launch Complex Department, Korea Aerospace Research Institute, Daejeon, Rep. of Korea.
4Jae-Yong Lee, Information and Communication Engineering Department, Chungnam National University, Daejeon, Rep. of Korea.
5Byung-Chul Kim, Information and Communication Engineering Department, Chungnam National University, Daejeon, Rep. of Korea.
Manuscript received on April 01, 2016. | Revised Manuscript received on April 09, 2016. | Manuscript published on April 15, 2016. | PP: 6-14 | Volume-4 Issue-4, April 2016. | Retrieval Number: D0979044416/2016©BEIESP
Open Access | Ethics and Policies | Cite
© The Authors. Published By: Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Because the network of Launch Control System (LCS) handles a volume of critical data in a server environment and a minor fault in the network can cause uncontrollable status during periods of launch campaign time, the network should provide the very reliable service. To achieve the goal, this paper discusses what requirements the network expects and what differences the network has comparing to other common networks. After considering requirements, differences and compatibility with Supervisory Control and Data Acquisition (SCADA) system, the physical and logical configurations for the LCS network are proposed to improve the reliability and efficiency. The experimental results show what values in failover parameters are the most suitable for the LCS network. And other results and traffic shapes which are measured during practical operational period confirm that the traffic and processing load are effectively redistributed as planned.
Keywords: Fault tolerance network, Industrial network, Launch Complex (LC), LCS, SCADA.